Hard bidding construction work

I've been hard bidding public projects lately and I typically work in a negotiated contract where the subcontractors are bought out in conjunction with the owner.

My question is what kind of risk am I taking by using a subs number in my bid. Suppose I get bids from three subs and take the lowest one. I then put that number in my bid to the owner and win the job. The sub then says they can't perform the work at that price and I'm left on the hook for the work. I can't get a bid bond from every sub so how can I mitigate this risk or do I just have to eat it?

Thanks,

John
www.constructonomics.com

constructonomics is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 11-05-2009, 09:40 PM   #2
JumboJack for president!
 
XanadooLTD's Avatar
Trade: Hilti walking billboard
 
Join Date: Oct 2007
Location: Ohio
Posts: 635
id figure 10% on top of the lowest bid then. You could brink next bid in if need be. Add 10% on top of their bid to your bid.
XanadooLTD is offline   Reply With Quote
Old 11-06-2009, 12:34 AM   #3
Pro
Trade: Painting & Flooring
 
Join Date: Jun 2009
Location: Portland, OR
Posts: 185
If you accept a bid from a sub then sign the contract with the provision that it is binding in the event that the whole project gets greenlighted. If they don't perform you can sue them for specific performance. Or you could put a penalty fee in the contract. Or both. What sub isn't going to perform; most everyone could use more work these days. Besides the whole point of the bid is to know what is going to cost to begin with.
__________________
Metro Maintenance & Landscaping
http://www.pdxmetropainting.com
Metro M & L is offline   Reply With Quote
Old 11-06-2009, 12:37 AM   #4
Pro
Trade: Painting & Flooring
 
Join Date: Jun 2009
Location: Portland, OR
Posts: 185
Looking at your post a second time it looks like you want to write the proposal with the low bid and then yank it and sub in the higher because the original sub couldn't do it 'at that price'. Keeps your #'s low at the outset and then they can go higher later after the fish is hooked?
__________________
Metro Maintenance & Landscaping
http://www.pdxmetropainting.com
Metro M & L is offline   Reply With Quote
Old 11-06-2009, 08:57 AM   #5
Pro
 
RCPainting's Avatar
Trade: Painting in Utah
 
Join Date: Jan 2006
Location: Southern Utah
Posts: 621
Maybe instead of going with the lowest "lowballing hack" bid you could go with the mid or upper and develop a relationship with a sub that can give you reasonable numbers and follow thru!
RCPainting is online now   Reply With Quote
Old 11-06-2009, 09:16 PM   #6
Member
Trade: Construction Management
 
Join Date: Aug 2009
Location: Newtown, PA
Posts: 61
Blog Entries: 6
It would be nice to go with a mid-level bid, but if I did that across the board I'd never get any work.

Maybe I'm overeacting, but I'm just worried about being left high and dry. When these guys send proposals over, I doubt they are legally binding, and I can't get them under contract until I know I have the job.

John
www.constructonomics.com
constructonomics is offline   Reply With Quote
Old 11-06-2009, 09:24 PM   #7
Pro
Trade: Remodeler
 
Join Date: Mar 2009
Location: NW NJ
Posts: 284
I never go with the low bidder, there is always a catch in the details. Check the scope of work and ask lots of questions before you choose anyone. I stick with my core group of guys who will do it right the first time. If there are a few minor unforeseens they will usually take care of it for free because I take care of them. You will not get this from the low bidder looking to raise his price to where it should have been in the first place.


Moral of the story:You get what you pay for!
HSConstruction is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Experienced Construction Virtual Assistant Looking for Work OnDemandPro Help Wanted or Looking For Work 0 08-21-2009 01:25 PM
Construction vs. Manufacturing. Who wins? poole_3 General Discussion 10 04-04-2009 07:51 PM
State work and requirements J-Peffer Business 2 01-26-2009 01:23 PM
taking a crack at my own concrete work J-Peffer Masonry 1 07-24-2008 02:42 PM
Trying to Expand Finding very hard to make it work plazaman Business 27 08-13-2007 12:19 AM




Top of Page | View New Posts


All times are GMT -5. The time now is 07:30 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC