Go With Your Gut

I just got back from meeting with a potential GC who had contacted me through my listing at Bid Clerk. First off, he was 10 minutes late to our 9AM meeting at his office. He had called to get a bid on a single-family conversion to a 2-family home and need a price for the electrical. I ask about the previous electrician he used and he hands me their business card.

"Strange that the electrician didn't list his license number on his card. By law in NJ it has to be on any piece of advertisement or associated business papers," I tell him.

I looked at the plans, asked specific questions, so on and so forth. He tells me the floors are finished and next up he needs to get the electrical done. Huh?

We are talking a house built approx 80 years ago and as most of you know that means plaster and lathe and generally a whole lot of mess. It makes zero sense to finish the floors before the plumber, painter, and electricians have done what they need to do. Do you agree?

Next, he tells me about a project he has going on in a town near by that he needs an electrician to give him a price. Ok. We drive there and I follow him in my van. When we get there, there is some framing done but the foundation hasn't been poured yet. Ok.

I look at the prints and get a general idea of what's happening here. Basically the plans call to knock down a garage space and expand the kitchen space. There aren't too many details as far as appliances go and already the homeowner is quick to make changes here and there to the lighting and receptacles. Then I have a look at the main panel and it is buried behind a boiler with practically no room to ever work inside the panel if need be. Then the HO "tells me" that he wants a 50 amp sub panel installed and to use this old 220 line to do it. This frustrates me because A) this my license on the line, and B) 50 amps is probably not enough for the kitchen he is proposing.

Then I offer to install a 20 circuit sub panel, 60 amp OCPD, and he tells me, "why so big? Why not a 6 or 8 circuit panel?"

I tell him about planning for the future and that I am the EC on this job and that I will not be cutting any corners based on price or any other circumstance to jeopardize my electrical license.

I said it as nicely as I could but it was not something he seemed to like very much.

I ask about the new garage that was built and who did the electrical. EMS he tells me, the same guys from before without the license number. It definitely showed that whoever wired the garage didn't know what the heck they were doing. You can just flat out tell just by looking. At least I can anyway.

Then, before I leave, I tell this GC to make sure he installs a UFER connection to the rebar because the inspectors going to want to see that for the electrical inspection.

He says, "what is a UFER and how do go about installing it?"

I look at him and tell him you've got to be kidding me. You are a general contractor and you do not know about building an addition and installing a UFER?

I tell him nice to meet you and that I'll back to you with prices on both jobs later next week.

My gut feeling is that this GC is not a good match for my new business based on the few things we spoke about this morning.

What do you think? Is my guy right? It's telling me to run, run, run away.

__________________
Classic Electric LLC
Repairs, Renovations, Rehabilitation

Last edited by Magnettica; 11-07-2009 at 12:05 PM.
Magnettica is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 11-07-2009, 12:11 PM   #2
MBS
Member
 
MBS's Avatar
Trade: Builder of fine someting or other and stuff
 
Join Date: Mar 2008
Location: Harshaw, WI
Posts: 95
Quote:
Originally Posted by Magnettica View Post
I look at him and tell him you've got to be kidding me. You are a general contractor and you do not know about building an addition and installing a UFER?

I tell him nice to meet you and that I'll back to you with prices on both jobs later next week.

My gut feeling is that this GC is not a good match for my new business based on the few things we spoke about this morning.

What do you think? Is my guy right? It's telling me to run, run, run away.
How many red flags does it take for you to get the message from your gut to your brain?
__________________
Build it like you love it.
MBS is offline   Reply With Quote
Old 11-07-2009, 12:14 PM   #3
---
 
loneframer's Avatar
Trade: residential framing/general carpentry
 
Join Date: Feb 2009
Location: Southern New Jersey
Posts: 3,598
Tough call there. He may have gained a great deal of respect for you and your knowledge. Bid the job to do it correctly and see what happens. It may be a problem if your name gets associated with the work that is already done though.
Might be a go with your gut scenario.
__________________
" It's a Jersey thing, you wouldn't understand"
loneframer is offline   Reply With Quote
The Following User Says Thank You to loneframer For This Useful Post:
Wolfgang (11-07-2009)
Old 11-07-2009, 12:20 PM   #4
Pro
 
WarnerConstInc.'s Avatar
Trade: Sure, what you got?
 
Join Date: Jan 2008
Location: Auburn Indiana
Posts: 3,893
Dont spend a ton of time pricing it but, get it close and give it to him. You never know. Dont wrap up a bunch of time yet.
__________________
Quote:
Originally Posted by Gus Dering View Post
It may be just a gateway tool to the hard stuff. Be careful
WarnerConstInc. is offline   Reply With Quote
Old 11-07-2009, 12:37 PM   #5
demo master
 
kevjob's Avatar
Trade: Remodeling General Contractor
 
Join Date: Aug 2006
Location: Denver Colorado
Posts: 1,459
Bid it for waht needs to be done up to code, profit etc... let hime worry whether or not he knows waht he is doing. BTW too many red flags for me to not get the triple price.
kevjob is offline   Reply With Quote
The Following User Says Thank You to kevjob For This Useful Post:
CCCo. (11-07-2009)
Old 11-07-2009, 12:52 PM   #6
Registered User
Trade: Kitchen and Bath remodels
 
Join Date: Nov 2009
Location: San Diego Ca.
Posts: 19
I think one of the hardest things I had to learn was when to walk away from a potential job, this has all of the signs.
Frank P is offline   Reply With Quote
Old 11-07-2009, 01:21 PM   #7
Illusion of Perfection
 
CookeCarpentry's Avatar
Trade: Residential Remodeler/Custom Carpenter
 
Join Date: Feb 2009
Location: Wayne, PA
Posts: 678
Mag -

Though I do agree about red flags and gut instinct, what do you have to lose with giving this guy a bid? Like others said, don't invest a whole lot of time in it, hell, even bid high.

He may respect your professionalism and knowledge enough to hire you.

If not, at least you had some practice bidding!
__________________
Mark
Wayne, PA
"It is what it is."
CookeCarpentry is offline   Reply With Quote
Old 11-07-2009, 01:37 PM   #8
Capra aegagrus
 
Tinstaafl's Avatar
Trade: Remodeler
 
Join Date: Jan 2008
Location: Central Pennsylvania
Posts: 1,892
Quote:
Originally Posted by Magnettica View Post
My gut feeling is that this GC is not a good match for my new business based on the few things we spoke about this morning.
How busy are you? I will almost never walk away without quoting some sort of a price. The higher the PITA expectancy, the higher the price.

The couple of times I've declined to do that, it was because I barely resisted punching the guy in the face during the initial contact.
Tinstaafl is offline   Reply With Quote
The Following User Says Thank You to Tinstaafl For This Useful Post:
tomstruble (11-09-2009)
Old 11-07-2009, 01:41 PM   #9
God Bless America
 
Magnettica's Avatar
Trade: Electrician
 
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,400
My gut is telling me to walk away. However, first I'd like to give the electrical inspector a call to hopefully get the low down on exactly what has taken place thus far. This way at least he knows a professional has taken over and assumed the responsibility, or is at the very least considering taking over. This job has all the signs of change orders and disputes for getting paid later on. I'm in no position financially to get burned, but then again who ever is?
__________________
Classic Electric LLC
Repairs, Renovations, Rehabilitation
Magnettica is offline   Reply With Quote
Old 11-07-2009, 03:02 PM   #10
Pro
Trade: General Contractor
 
Join Date: Aug 2008
Location: Western Washington
Posts: 147
Ummmmmm, What's a UFER? I that a tie in the to the rebar to replace the ground rods?
jhark123 is offline   Reply With Quote
Old 11-07-2009, 03:53 PM   #11
Pro
 
freemason21's Avatar
Trade: carpentry and painting
 
Join Date: Aug 2009
Location: massachusetts
Posts: 331
like some said, theres no harm in giving him a bid. he seems to respect your opinion, that could work very much in your favor. especially if he's willing to pay your price.
__________________
Quote:
Originally Posted by Mike Finley View Post
You're probably the next coming of Jesus in regards to construction.
freemason21 is online now   Reply With Quote
Old 11-07-2009, 03:56 PM   #12
Pro
Trade: Framing
 
Join Date: Jan 2009
Location: Utica,NY
Posts: 521
Quote:
Originally Posted by jhark123 View Post
Ummmmmm, What's a UFER? I that a tie in the to the rebar to replace the ground rods?
Glad someone else asked!
Framer53 is offline   Reply With Quote
Old 11-07-2009, 04:31 PM   #13
demo master
 
kevjob's Avatar
Trade: Remodeling General Contractor
 
Join Date: Aug 2006
Location: Denver Colorado
Posts: 1,459
its a ground.
kevjob is offline   Reply With Quote
Old 11-07-2009, 05:18 PM   #14
God Bless America
 
Magnettica's Avatar
Trade: Electrician
 
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,400
The UFER is the #4 copper wire attached to the rebar inside the footing. It is used and required as a grounding electrode for an electrical system.

Ufer is the gentlemen's name who came up with the concept. It is sometimes referred to as a concrete-encased electrode.

It must always be left long enough to reach the main disconnect (no sub panels), of the electrical system.


picture-concrete_encased_electrode
__________________
Classic Electric LLC
Repairs, Renovations, Rehabilitation
Magnettica is offline   Reply With Quote
Old 11-07-2009, 05:56 PM   #15
Pro
 
Brickie's Avatar
Trade: Masonry, Hardscapes, Demo/Rehab/PP
 
Join Date: Jun 2006
Location: Chicagoland & NW Indiana
Posts: 753
Quote:
Originally Posted by Magnettica View Post
My gut is telling me to walk away. However, first I'd like to give the electrical inspector a call to hopefully get the low down on exactly what has taken place thus far. This way at least he knows a professional has taken over and assumed the responsibility, or is at the very least considering taking over. This job has all the signs of change orders and disputes for getting paid later on. I'm in no position financially to get burned, but then again who ever is?

I would have to say go with your gut. Way too many red flags
__________________
The nine most terrifying words in the English language are, 'I'm from the government and I'm here to help.

Ronald Reagan
Brickie is offline   Reply With Quote
Old 11-07-2009, 06:33 PM   #16
God Bless America
 
Magnettica's Avatar
Trade: Electrician
 
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,400
Too many red flags... I agree.

Done deal, I prefer working directly for HO's anyway. Getting paid after a day or two of work at someone's home is really the best option.

Thanks for all the input and advice.
__________________
Classic Electric LLC
Repairs, Renovations, Rehabilitation
Magnettica is offline   Reply With Quote
Old 11-07-2009, 06:37 PM   #17
God Bless America
 
Magnettica's Avatar
Trade: Electrician
 
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,400
Quote:
Originally Posted by Tinstaafl View Post
How busy are you? I will almost never walk away without quoting some sort of a price. The higher the PITA expectancy, the higher the price.

The couple of times I've declined to do that, it was because I barely resisted punching the guy in the face during the initial contact.
Not very busy at all, but I'm learning that that changes in a heartbeat in this business. I'm declining to work for this guy so as to not associate my name with his. I've worked very hard to get to where I am at now and I don't want to ruin my name because I'm a little slow at the moment. Maybe in a year or two after I'm more established I'll be able to take your advice and shoot a high number and deal with it, but nows not the time.
__________________
Classic Electric LLC
Repairs, Renovations, Rehabilitation
Magnettica is offline   Reply With Quote
Old 11-07-2009, 06:40 PM   #18
Pro
Trade: Remodeler
 
Join Date: Mar 2009
Location: NW NJ
Posts: 284
Quote:
Originally Posted by Magnettica View Post
The UFER is the #4 copper wire attached to the rebar inside the footing. It is used and required as a grounding electrode for an electrical system.

Ufer is the gentlemen's name who came up with the concept. It is sometimes referred to as a concrete-encased electrode.

It must always be left long enough to reach the main disconnect (no sub panels), of the electrical system.


picture-concrete_encased_electrode
Even though we do this on every job I would have said "WTF is UFER?" I had no idea that was the name for it. You learn something new everyday.
HSConstruction is offline   Reply With Quote
Old 11-07-2009, 06:43 PM   #19
God Bless America
 
Magnettica's Avatar
Trade: Electrician
 
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,400
Quote:
Originally Posted by HSConstruction View Post
Even though we do this on every job I would have said "WTF is UFER?" I had no idea that was the name for it. You learn something new everyday.
So you agree then that a licensed contractor should know that one has to be made up for an addition/ concrete foundation pour. Right?

This guy had no idea what I was talking about.
__________________
Classic Electric LLC
Repairs, Renovations, Rehabilitation
Magnettica is offline   Reply With Quote
Old 11-09-2009, 12:50 AM   #20
Pro
 
Thewoodman's Avatar
Trade: Remodeler/Deck builder
 
Join Date: Aug 2006
Location: Ogden, Utah
Posts: 195
It is hard to walk away from work when things are slow. But if you are going to be wasting valuable time dealing with a pita, your time would be better spend finding a better customer.

Move on.

Mark
__________________
Never let the fear of striking out keep you from playing the game.
www.wasatchvalley.com
Thewoodman is offline   Reply With Quote
The Following User Says Thank You to Thewoodman For This Useful Post:
Frank P (11-09-2009)
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off





Top of Page | View New Posts


All times are GMT -5. The time now is 03:26 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC