Dealing With Differences Of Opinion On Productivity.
Gentlemen,
My current job: Gut the main floor and a complete reno - update wiring, reinsulate, drywall, flooring, ceilings... I've sub-contracted some of the work to a general carpentry sub-contractor. He's got a small crew of a couple of young guys. They started today. End of the day, they've basically managed to gut a single 8x10 room and taken down the partition wall between it and the next room. On my last job like this, me and the 60-year old guy I hired completely gutted a 600 sq ft apartment - kitchen & bathroom and all down to the studs - in a day and a half. Always done all the work myself with a crew of my own choosing. So I'm not used to having to tell someone who's supposed to be an independent contractor that my standard of productivity is to be considered the proper standard and his crew's productivity isn't up to snuff. That is, I'm about to do some on the job learning about managing sub-contractors. Materials scheduling, estimation, that's one thing. A stud costs $X and you need Y of them, no problem. But "you're not working fast enough" is a little more vague and open to interpretation and getting into telling someone how to do their job. Not sure what question I'm asking, except maybe other experiences with this. Thanks. |
|
|
|
|
|
#2 |
|
Pro
Trade: Pretty much anything with wood
Join Date: Jan 2008
Location: Cape Ann Area, MA
Posts: 1,222
|
Re: Dealing With Differences Of Opinion On Productivity.
"couple young guys" is the key word here. Haven't been doing it long enough to bang it out quick.
|
|
|
|
|
|
#3 |
|
Sean
|
Re: Dealing With Differences Of Opinion On Productivity.
Are you paying them hourly? Do they have a schedule to meet?
2 options & both don't have to be independent of each other; the first - talk to the main boss, remind them of the schedule, etc... the second - give the crew a few pointers / idea's for speeding up / making life easier on them, etc... If your paying them hourly - well you can always fire them.... Good luck |
|
|
|
|
|
#4 |
|
Pro
Trade: renovator
Join Date: Jan 2008
Posts: 511
|
Re: Dealing With Differences Of Opinion On Productivity.
Ya, I saw that too. Found them mid-day tapping at a wall with these little 12" pry bars - told them to be sure to come back tomorrow with sledge hammers and 3-foot wecking bars.
|
|
|
|
|
|
#5 | |
|
Pro
Trade: renovator
Join Date: Jan 2008
Posts: 511
|
Re: Dealing With Differences Of Opinion On Productivity.Quote:
|
|
|
|
|
|
|
#6 | |
|
Pro
Trade: Licensed Electrical Contractor and Remodeler
Join Date: Sep 2009
Location: Chicago Suburbs
Posts: 7,002
|
Re: Dealing With Differences Of Opinion On Productivity.Quote:
Was it up to them to read the framing to ensure it was a partition and not a lb wall. When I move a lb wall and re-header, etc, it takes me forever. I look at every possibility. If they had no decisions to make and were just told what to demo, then they sound more than a little slow. Was anyone supervising them? Edit-questions answered and potential solution is in the making. Good luck and let us know!
__________________
220...221...whatever it takes! Last edited by rselectric1; 11-04-2009 at 07:34 PM. |
|
|
|
|
|
|
#7 |
|
Pro
Trade: renovator
Join Date: Jan 2008
Posts: 511
|
Re: Dealing With Differences Of Opinion On Productivity. |
|
|
|
|
|
#8 |
|
Pro
Trade: interior remodeling
Join Date: Oct 2008
Location: Kane Co. Illinois
Posts: 1,569
|
Re: Dealing With Differences Of Opinion On Productivity.
I never have 'subbed' out the demo. If they are hourly and they came with no skills or knowledge, you have basically hired day laborers.
You are going to have to train them and ride shotgun over these guys. Your problem is with the man you got them from. Sounds like he just sent you some warm bodies. Good luck, Let us know how this works out.--MIKE-- |
|
|
|
|
|
#9 |
|
Illusion of Perfection
Trade: Carpenter
Join Date: Feb 2009
Location: Douglassville, PA
Posts: 2,619
|
Re: Dealing With Differences Of Opinion On Productivity.
x2 with mikeswood re: just a couple of warm bodies.
I have only subbed demo out on a few occassions, and it was to a demolition contractor - they get it done quick but clean-up and site protection is sub-par - I really had to be on them about it. Could be too, that the 2 young guys you got were told by their boss to "milk it" because work was slow, etc. |
|
|
|
|
|
#10 |
|
it is what it is
Trade: General Contractor
Join Date: Sep 2009
Location: Milwaukee and Surrounding Area, WI
Posts: 113
|
Re: Dealing With Differences Of Opinion On Productivity.
My 2 cents Are:
If your paying them who cares if you hurt their feelings for being slow, they won't know unless you say something. Also they could be feeling you out to see if your passive on how much time it takes. 2nd I would never leave the door wide open like that with someone new. I would ask for a bid the first time working with someone new. After a few times you'll have a good idea on how long it takes them. Then you have some ammo to compare to if they decied to slack. |
|
|
|
|
|
#11 | |
|
Pro
Trade: Framing,Remodeling,General Contractor
Join Date: Mar 2009
Location: Kansas City
Posts: 1,922
|
Re: Dealing With Differences Of Opinion On Productivity.Quote:
Did you expect them to be as good as you? |
|
|
|
|
| The Following User Says Thank You to knucklehead For This Useful Post: | Zinsco (11-06-2009) |
|
|
#12 |
|
Remodeling GC
Trade: Remodeling General Contractor
Join Date: Aug 2006
Location: Denver Colorado
Posts: 2,033
|
Re: Dealing With Differences Of Opinion On Productivity.
I do all the demo with some day laborers I get from Labor Ready all work comp etc.. $14.50 an hour per guy, too many variables to destroy with demo.
__________________
Kevin Basement Finishing Highlands Ranch Colorado Littleton Colorado, Basement Remodeling Kitchen Remodeling Denver |
|
|
|
|
|
#13 | |
|
The Remodeler
Trade: Home Remodeler
Join Date: Apr 2005
Location: Long Island, NY
Posts: 940
|
Re: Dealing With Differences Of Opinion On Productivity.Quote:
That's been my thinking for years, and that's why I dont make nearly as much money as I should. No one can ever do it as fast or as well as you, right? I've finally started bringing others in for certain tasks, and it's a relief seeing the extra work being completed each week. In the OP's case, he made a mistake by hiring a "sub" on an hourly rate, and not opening his mouth when they move like snails... I can gut an 8x10 room by 11am all by myself! |
|
|
|
|
|
|
#14 |
|
KemoSabe
Trade: residential framing/siding/general carpentry
Join Date: Feb 2009
Location: Vineland, New Jersey
Posts: 12,828
|
Re: Dealing With Differences Of Opinion On Productivity.
Seperate them, give them each an equal amount of work to do and offer the first done a cash bonus. Incentive is a beautiful thing.
__________________
__________________________________ "Walking the fine line between production and perfection" __________________________________ |
|
|
|
| The Following 2 Users Say Thank You to loneframer For This Useful Post: | nlgutters (11-04-2009), SC sawdaddy (11-05-2009) |
|
|
#15 |
|
Pro
Trade: Licensed Electrical Contractor and Remodeler
Join Date: Sep 2009
Location: Chicago Suburbs
Posts: 7,002
|
Re: Dealing With Differences Of Opinion On Productivity.
On 2 recent jobs, the demo guys my co-op hired would have done more damage than good.
If I wasn't there to supervise them, they would have ripped the kitchen sink along with all the plumbing right out of the wall. This among many other mechanical disasters they could have caused. If you hire a demo crew (for kitchens or baths), my advice is to get there the day prior, dismantle the mechanicals, locate the areas and or walls you want demo'd, then stand there and direct traffic on demo day. These friggin guys on the last job were going to tear down a load bearing wall, framing and all. Thank god I was there to tell them to stop and I just wanted the drywall removed from this wall.
__________________
220...221...whatever it takes! |
|
|
|
|
|
#16 | |
|
Capra aegagrus
Trade: Remodeler
Join Date: Jan 2008
Location: Central Pennsylvania
Posts: 9,758
|
Re: Dealing With Differences Of Opinion On Productivity.Quote:
That really does no one any good. Your sub (employee, whatever) needs feedback so that he can either adjust his procedures or keep them in place. Sure, he'll eventually figure it out by how many times he does or doesn't get a job from you, but if he really wants to do well, a good chunk of constructive criticism is the best thing you can do for him. And for you. |
|
|
|
|
|
|
#17 |
|
Grand Rapids Remodeling
Trade: Remodeling Contractor
Join Date: Feb 2009
Location: Grand Rapids, MI.
Posts: 2,340
|
Re: Dealing With Differences Of Opinion On Productivity.
I've found good demo guys have a certain mind set. Fast demo does require experience and it sounds like the laborers had neither.
www.phbconstruction.com Last edited by Paulie; 11-15-2009 at 09:35 PM. |
|
|
|
|
|
#18 |
|
Doofenshmirtz Evil Inc.
Trade: GC
Join Date: Aug 2007
Location: Lakewood CA.
Posts: 3,659
|
Re: Dealing With Differences Of Opinion On Productivity.
I'm getting to old to do demo.It wipes me out.Kills my back.
__________________
in texas with framing and cornish people will do it for 3.00 a foot. What do yall think about that? Just laber |
|
|
|
|
|
#19 |
|
Pro
Trade: Licensed Electrical Contractor and Remodeler
Join Date: Sep 2009
Location: Chicago Suburbs
Posts: 7,002
|
Re: Dealing With Differences Of Opinion On Productivity.
In your photo, you look pretty fit. Except for that head of yours. How in the heck do you get turtlenecks over that?
__________________
220...221...whatever it takes! |
|
|
|
|
|
#20 |
|
Doofenshmirtz Evil Inc.
Trade: GC
Join Date: Aug 2007
Location: Lakewood CA.
Posts: 3,659
|
Re: Dealing With Differences Of Opinion On Productivity.
I won't lie.That picture is a few years old.
__________________
in texas with framing and cornish people will do it for 3.00 a foot. What do yall think about that? Just laber |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| My first Solar Screens... opinion | JaxBuild | General Discussion | 21 | 02-10-2012 07:25 PM |
| Marketing opinion... | JaxBuild | General Discussion | 8 | 08-11-2009 11:02 PM |
| dealing w/ city/state re: removal of trees | 72chevy4x4 | Landscaping | 4 | 03-22-2009 10:54 PM |
| dealing with a complete mad man | ultimatetouch | Business | 30 | 10-27-2008 11:17 PM |
| Differences between SOLE PROP TO LLC | MazalBuild | General Discussion | 6 | 09-19-2008 10:59 AM |
| Go to Page... |