Bill For Setup And Cleanup Time

 
Thread Tools Search this Thread Display Modes
Old 07-21-2009, 04:56 PM   #1
topsail's trimcat
 
woodworkbykirk's Avatar
 
Trade: finish Carpenter/ renovations
Join Date: Sep 2008
Location: ns, canada
Posts: 3,250

Bill For Setup And Cleanup Time


i got in a discussion with one of the guys on our crew today, it was about billing for the time we spend setting up and tearing down the tools during the day.

most of them dont bill for the 30 minutes or so we spend setting up and packing up each day, sometimes it can be longer depending on how much gear we need. ive always billed for this time as im on site handling tools and such. on the days where im standing around more than id like, being do to waiting for materials or an answer as to what the detail is on something ill take time off my day and whatnot

is this a case of going easy on the general or ripping yourself off. being not counting set up time as part of the workday

__________________
putting down subfloor with glue and screws, well i saw dr. smith and the robot too , i had a martian burger and a sonic shake
woodworkbykirk is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 07-21-2009, 05:02 PM   #2
Pro
 
Warren's Avatar
 
Trade: framing/remodeling
Join Date: Feb 2005
Location: NE Ohio
Posts: 3,696

Re: Bill For Setup And Cleanup Time


Can't perform the work without setup and tear down. You pay your employees for this time right? Why would you not charge for it.
How about travel time from one job to another during the day? I usually don't charge for this if we are doing it because we forgot something or need to fix something that was our fault. If the GC calls and needs something done ASAP, he gets charged for the travel. Employee gets paid for it as well as 55 cents per mile, so I feel it has to be charged to GC.
Warren is offline  
Old 07-21-2009, 05:03 PM   #3
Custom Stuff
 
Mike(VA)'s Avatar
 
Trade: General Contractor - Custom Renovations
Join Date: Jan 2008
Location: Manassas, VA
Posts: 859

Re: Bill For Setup And Cleanup Time


If you are billing me on a T&M basis, by all means add or subtract as necessary the time you spend working or not working. If you are billing me on a cost-plus, same thing. However, if you are billing me on a fixed price basis, you better hope you have figured that stand-down time into your price because you are not coming back to me with extras.

That said, however you bill, you should figure ANY time you spend on the site or related to the job. Period. You may be sitting around waiting for materials, but its not like you can leave and go do something else productive.
__________________
__________________________________________________ ___________
I EXPECT THAT SOMEDAY I WILL SEE THE FRUITS OF MY LABOR. IS IT SOMEDAY YET?
Clifton, Great Falls, McLean, Fairfax Station, Manassas, Virginia Renovation Contractor
Mike(VA) is offline  
Old 07-21-2009, 05:09 PM   #4
You did what??
 
J F's Avatar
 
Trade: Carpenter
Join Date: Dec 2005
Location: North of Atlanta
Posts: 6,600

Re: Bill For Setup And Cleanup Time


In my own estimating I usually put in $300-$400 for set-up/tear-down/clean-up for trim work. This usually will include a small amount of flooring protection.

Anything more, needs to be accounted for. Of course this isn't disclosed just a total amount for the work, but it needs to be accounted for in your estimating.
J F is offline  
Old 07-21-2009, 05:44 PM   #5
Member
 
crazyboy's Avatar
 
Trade: Electrical
Join Date: Nov 2008
Location: NJ
Posts: 77

Re: Bill For Setup And Cleanup Time


You still have the same overhead whether your setting up the tools or using them.
crazyboy is offline  
Old 07-21-2009, 05:54 PM   #6
It's Not a Toomaa!!
 
HandyHails's Avatar
 
Trade: Remodels
Join Date: Feb 2009
Location: Reading Pennsylvania
Posts: 1,513

Re: Bill For Setup And Cleanup Time


When I'm working on an hourly rate, I charge from the time I knock on the door until the time I present the bill. I fill out the invoice and walk over to the homeowner look at my watch and round down to the nearest 15 minutes. This time ALWAYS includes set up and tear down. Also it includes any time needed to get materials that I do not have stocked. That's handyman type stuff usually, so this may not really apply to what your referring to.
__________________
Josh

hhicontracting.com
HandyHails is offline  
Old 07-21-2009, 06:03 PM   #7
Pro
 
mattp's Avatar
 
Trade: roofing
Join Date: Apr 2006
Location: Brookfield Missouri
Posts: 328

Re: Bill For Setup And Cleanup Time


When I first started on my own a GC got me a job working for a lady remodeling her house. Every Friday she would pay me, the plumber, the electrician, and the GC. She was supose to be there at 5 pm if she was late the plumber would go out to his truck, grab his statement book, and write up a new bill for the waiting time. Usally another 30 min.
mattp is offline  
Old 07-21-2009, 07:11 PM   #8
Contractor
 
72chevy4x4's Avatar
 
Trade: Remodeling & Home Additions
Join Date: Sep 2006
Location: Delaware
Posts: 2,434

Re: Bill For Setup And Cleanup Time


I got to the point where I add time to work with the consultants/designers. Also billing for small jobs sometimes starts when leaving the last job and stops when walking off the new job-so you are getting paid for drive to the job (picked that up from the plumbers). Specifically regarding setup/cleanup-that's absolutely part of the billable time. As someone pointed out, you're paying the employees to setup and cleanup...on the other hand if you're being paid per linear foot of crown for instance, that's not hourly wage and your setup/cleanup is on you, but then again you have incentive to hustle!
72chevy4x4 is offline  
Old 07-21-2009, 08:12 PM   #9
Pro
 
RayGoerdt's Avatar
 
Trade: Residential building/Remodeling
Join Date: Nov 2008
Location: Minnesota
Posts: 685
Send a message via AIM to RayGoerdt

Re: Bill For Setup And Cleanup Time


I figure it all as work time,

I had to add to one bill when I did some work for another contractor and had to hunt him down to collect,
RayGoerdt is offline  
Old 07-21-2009, 10:29 PM   #10
Pro
 
Big Shoe's Avatar
 
Trade: Home repairs,drywall,trim.
Join Date: Jun 2008
Location: Florida
Posts: 980

Re: Bill For Setup And Cleanup Time


Are you the boss,or part of the crew?....You bill and they don't?.........Am I missing something here? I would expect to get paid for all time spent working.
Big Shoe is offline  
Old 07-21-2009, 10:33 PM   #11
Pro
 
genecarp's Avatar
 
Trade: LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 5,426

Re: Bill For Setup And Cleanup Time


Charge me, I am charging the client. G
__________________
genecarp is offline  
Old 07-22-2009, 06:29 AM   #12
Pro
 
PA woodbutcher's Avatar
 
Trade: Remodeling
Join Date: Mar 2007
Location: Northeast, Pa
Posts: 1,908

Re: Bill For Setup And Cleanup Time


Time and Material and cost plus is all boots on the ground. If firm price is give it's already figured in at rounded off to an hour a day.

Sometimes if I have a customer that is pleasant to work with, and I happen to have already went past the original estimate I will split the time with them...they pay setup, I pay for tear down or visa versa depending on what time I hit the job.
__________________
'The trouble with our liberal friends is not that they're ignorant; it's just that they know so much that isn't so.' - Ronald Reagan
PA woodbutcher is offline  
Old 07-22-2009, 07:18 AM   #13
Member
 
insane's Avatar
 
Trade: masonry
Join Date: May 2009
Location: RI
Posts: 76

Re: Bill For Setup And Cleanup Time


It's all part of the job, charge for it.

Tim
insane is offline  
Old 07-22-2009, 07:21 AM   #14
Professional Instigator
 
rbsremodeling's Avatar
 
Trade: Design Build Remodeling Contractor DC MD
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,872

Re: Bill For Setup And Cleanup Time


I have two line items one for job protection and one for clean up. You can just figure out the time it takes and add it to the cost of the job with out the line items
__________________

rbsremodeling is offline  
Old 07-22-2009, 06:42 PM   #15
Registered User
 
FPI's Avatar
 
Trade: Construction/Remodeling
Join Date: Mar 2009
Location: Louisville
Posts: 5

Re: Bill For Setup And Cleanup Time


I usually plan on an eight to five day when estimating. We setup when we arrive at the site at eight and stop working to break down sometime before five so we can leave at five.
FPI is offline  
Old 07-22-2009, 10:57 PM   #16
topsail's trimcat
 
woodworkbykirk's Avatar
 
Trade: finish Carpenter/ renovations
Join Date: Sep 2008
Location: ns, canada
Posts: 3,250

Re: Bill For Setup And Cleanup Time


on the note of billing for getting sent to another site mid day, yes i do bill for this time for travel, i pay for my own gas when heading to work in the morning and at the end of the day but if im sent to another site. the minute i leave site A im billing to site B.

but if i am standing around do to a light rain shower or waiting waiting for it to stop or waiting for more material to arrive ill usually take that time off my time card.

right now im working for a general directly as opposed to subbing.

worked for one general who would send me to a site to do something and he wouldnt have material on site until late in the day, i sure as hell would bill for my time because i was normally the only guy on site. he called me out on it and i simply told him dont send me there unless the material is there waiting to be used other wise im billing to make up for the money i wasted in gas to drive there and not just $5 worth, ill bill the worth of a tank.. had to leave that contractor, too much disorganation and bs being fed to the HO
__________________
putting down subfloor with glue and screws, well i saw dr. smith and the robot too , i had a martian burger and a sonic shake
woodworkbykirk is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Portable dust collection/blasting cleanup blastoffinc Sandblasting 17 05-20-2009 12:43 AM
Hurricane debris cleanup jobs? sdlsjl Help Wanted or Looking For Work 16 10-21-2008 03:30 PM
Cleanup after tile job is done bqtchef Ceramic & Stone Tile 3 10-16-2008 01:11 AM
Replacing double window w slider 1st time dvlscapes Carpentry 5 09-03-2008 02:26 PM
Job Site Time Clocks personalt Business 1 03-29-2006 04:10 PM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?