Question What a mess!

Was hired to remove carpeting in 4 rooms pluss hallway of a home on the market. Home had 1970’s carpet with the rubber padding and over time had adhered itself to the HWF’s. Realtor met me there and while she was there I pulled up sections to show her that there was a mess with the old padding and told her I would get up what I could. My team showed up the next day and removed the carpet and scraped a large amount of the padding but could not remove it all. We scraped with adhesive remover and noticed scraping was scratching and denting the floors) and suggested that it be either refinished or re-carpeted.

Realtor looks at it after we worked all day and said “your not done are you?”. I again suggested that she have it re-carpeted or re-finished and was then told that she has no money for that and she is disappointed and thought she would come back to see beautiful HWF’s.

The fee we agreed on was $350 (that included removing and disposing of all carpet, and tack strips in 4 rooms plus a hallway). She wants to re-bargain the fee – since she didn’t come back to see beautiful HWF’s. I’m new at this (Independent Contractor for 1 year) and am not quite sure what to do as this is the 1st time I have ran into this.

Lanham79 is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 06-16-2009, 10:20 AM   #2
Home Depot aisle walker
 
willworkforbeer's Avatar
Trade: home remodeling
 
Join Date: Mar 2009
Location: Tulsa OK
Posts: 906
Quote:
Originally Posted by Lanham79 View Post
The fee we agreed on was $350
At least you got the price right.
willworkforbeer is offline   Reply With Quote
The Following 2 Users Say Thank You to willworkforbeer For This Useful Post:
loneframer (06-16-2009), naptown CR (06-16-2009)
Old 06-16-2009, 10:47 AM   #3
Internet Creep
 
angus242's Avatar
Trade: Kitchen/Bath Remodeling, Tile
 
Join Date: Oct 2007
Location: Will County, Illinois
Posts: 1,066
You're new and just learned a valuable lesson. Make sure you cover ALL aspects in your contract. When you're involved with remodeling, you don't know what you don't know. You can't put on x-ray glasses and see behind walls or under flooring. You need to have verbiage in your contract to cover your ass. It's in your best interest to be up front with your customer that you are going to perform a certain task and if anything else comes up, there may be extra costs.
This is a classic case of miscommunication. The realtor assumed the job was going to give her beautiful floors. You didn't convey the possibility of there being leftover residue from the padding. You did what you said you would do and should be paid for your labor. Now that there's extra labor to be performed, you shouldn't have to work for free. This all could have been resolved with you INFORMING your customer BEFORE the work started.
Lesson learned!
__________________
"If you're good at something, never do it for free."
angus242 is online now   Reply With Quote
Old 06-16-2009, 11:13 AM   #4
LRG WoodCrafting
 
Leo G's Avatar
Trade: Professional Sawdust Producer
 
Join Date: May 2005
Location: USA, Connecticut
Posts: 3,768
1st of all, when someone carpets over HWF more than likely there was a reason. They looked like crap. There was a 1 in 50 chance that there would have been beautiful HWF underneath the carpeting. There is no way that you could expect to pull up a carpet and then live on the floor without it being refinished. Her expectations are not realistic. You should have had some verbiage in the contract that said that you were responsible for removing and disposing of the carpet, pad and tack strips. But the condition of the floor was unknown and no guaranties would be offered on how the look of the HWF would be. You did your job, now you need to get paid.
__________________
Measure Twice Cut Once -- It's a lot easier to cut more off then it is to cut MORON.
Quote:
Originally Posted by HusqyPro View Post
Carpenter by day.
Mad scientist by night.
http://lrgwood.com
Leo G is online now   Reply With Quote
Old 06-16-2009, 11:23 AM   #5
Custom Stuff
 
Mike(VA)'s Avatar
Trade: General Contractor - Custom Renovations
 
Join Date: Jan 2008
Location: Manassas, VA
Posts: 837
Leo said:

You should have had some verbiage in the contract...

Bet you a dollar to a donut that there's no contract. If there is, it is so ambiguous that it becomes a 'he-said-she-said' argument.

Lanham 79, I would tell her that you have accomplished what you both agreed to and you are sorry the floors are not in the condition she expected, but without funds available for refinishing, there isn't much you can do. You can be sure the agent told a seller or buyer that it would help the sale if the floors were taken care of. Her problem now and if she won't pay, go to her broker and give him the bill.
__________________
__________________________________________________ ___________
You are not making progress unless someone is trying to get in your way. I will never give up!
Clifton, Great Falls, McLean, Fairfax Station, Manassas, Virginia Renovation Contractor
Mike(VA) is offline   Reply With Quote
Old 06-16-2009, 11:31 AM   #6
Pro
Trade: Home Remodeling
 
Join Date: Dec 2007
Posts: 1,365
Handyman
SelfContract is offline   Reply With Quote
Old 06-16-2009, 12:03 PM   #7
LRG WoodCrafting
 
Leo G's Avatar
Trade: Professional Sawdust Producer
 
Join Date: May 2005
Location: USA, Connecticut
Posts: 3,768
If she doesn't pay bring the carpet and pad back and dump it in the yard/house. If she doesn't pay then there is no removal or dumping.
__________________
Measure Twice Cut Once -- It's a lot easier to cut more off then it is to cut MORON.
Quote:
Originally Posted by HusqyPro View Post
Carpenter by day.
Mad scientist by night.
http://lrgwood.com
Leo G is online now   Reply With Quote
Old 06-16-2009, 12:12 PM   #8
LRG WoodCrafting
 
Leo G's Avatar
Trade: Professional Sawdust Producer
 
Join Date: May 2005
Location: USA, Connecticut
Posts: 3,768
How can you possible exchange money without a contract. I just don't see it.
__________________
Measure Twice Cut Once -- It's a lot easier to cut more off then it is to cut MORON.
Quote:
Originally Posted by HusqyPro View Post
Carpenter by day.
Mad scientist by night.
http://lrgwood.com
Leo G is online now   Reply With Quote
Old 06-16-2009, 02:31 PM   #9
37 year installer
 
rusty baker's Avatar
Trade: flooring
 
Join Date: Jun 2008
Location: Missouri
Posts: 103
That "bubble rubber" pad, actually had a clay base. Over time it reverts to clay and almost becomes part of the wood. The only way to remove it completely is to sand the floor.
rusty baker is offline   Reply With Quote
The Following User Says Thank You to rusty baker For This Useful Post:
Metro M & L (06-20-2009)
Old 06-16-2009, 03:20 PM   #10
Flooring Guru
 
Floorwizard's Avatar
Trade: Sales Manager
 
Join Date: Sep 2003
Location: Anchorage, AK
Posts: 2,785
Perfect example of customer expectations.
Even the most detailed contract will not cover customer expectations in full.

Good lesson to learn....
I call it "defensive selling"

It's just like defensive driving when I am on my Motorcycle....
I EXPECT:
the driver to swerve into my lane without a signal
the car in front of me to blow their tire and slam on their brakes
the boat to unlatch from the truck and come right for me
a pedestrian to run out in the road
a Moose to run out in the road

Knowing these things helps me prepare for any possibility....

When I sell Carpet I EXPECT:
The customer to think the Carpet seam will be invisible
the carpet will last forever
roll crush will exist
nothing will stain the carpet
stairs will never show wear

knowing these things help me prepare the customer during the presentation to set more realistic expectations....
even that doesn't gaurantee anything...but it helps.
__________________
------------------------
"in 20 years you will regret more what you did not do than what you did"
Floorwizard is offline   Reply With Quote
The Following User Says Thank You to Floorwizard For This Useful Post:
BobsLandscaping (06-18-2009)
Old 06-16-2009, 05:23 PM   #11
Custom Stuff
 
Mike(VA)'s Avatar
Trade: General Contractor - Custom Renovations
 
Join Date: Jan 2008
Location: Manassas, VA
Posts: 837
Floorwizard said:
I EXPECT: a Moose to run out in the road

Only in Alaska, Maine, and a few states near Canada. Best we can do here is white tail deer. Still mess up your car, but a moose; they're talking about you in past tense after hitting one of those.
__________________
__________________________________________________ ___________
You are not making progress unless someone is trying to get in your way. I will never give up!
Clifton, Great Falls, McLean, Fairfax Station, Manassas, Virginia Renovation Contractor
Mike(VA) is offline   Reply With Quote
Old 06-16-2009, 06:11 PM   #12
Chief outhouse engineer
 
dakzaag's Avatar
Trade: mason
 
Join Date: Jan 2009
Location: NW Indiana
Posts: 356
[
Quote:
. My team showed up the next day


Quote:
The fee we agreed on was $350 (that included removing and disposing of all carpet, and tack strips in 4 rooms plus a hallway).


You must not have any overhead to be paying more than one guy to work all day and dispose waste for tree fiddy.

Sorry but this has a very familiar odor...
__________________
D K & Sons
The maintenance schedule for brick
1. Stand back and say "man that looks nice!"
2. Repeat as often as needed.
dakzaag is offline   Reply With Quote
Old 06-17-2009, 06:58 AM   #13
egotistical prick
 
Cdat's Avatar
Trade: Wood Inlay
 
Join Date: Apr 2007
Location: Swartz Creek, Michigan
Posts: 2,382
I make that in a couple of hours.
__________________
"Nothing is too good for you guys...and that's exactly what you're gonna get..."
"'Status quo,' as you know, is Latin for 'the mess we're in...'"
Cdat is offline   Reply With Quote
Old 06-17-2009, 07:50 AM   #14
37 year installer
 
rusty baker's Avatar
Trade: flooring
 
Join Date: Jun 2008
Location: Missouri
Posts: 103
How much you can charge depends on where you live. For example, the going installation rate for carpet here is $4 per yd. Some areas it is twice as much. The average worker, factory, fast food, etc here, only makes $8-$10 hr.
rusty baker is offline   Reply With Quote
Old 06-17-2009, 08:26 AM   #15
Registered Member
Trade: Construction Law
 
Join Date: Oct 2007
Location: Chicago, Illinois
Posts: 18
The realtor is being a jackass, whether she knows it or not. So don't beat yourself up too much for her failings.

That said, it's a good opportunity to think what else you can do to get a better result in the future. You mention trying to manage her expectations by showing her the area underneath, which is good. Obviously she didn't really get it.

Putting it in writing and having her sign it is one good way to make it feel like more of a commitment on her part. You can't put everything in a contract because it would be 500 pages long and no customer would ever sign it. But there is a healthy balance of specificity you can strike.

In the future, you could also ask more about her desired end result before starting work. Yes, she's a twit and it takes time, but she's not a GC and that's the cost of having customers. With the benefit of hindsight, you could easily have determined that she had no budget for the next step. You could have placed yourself more in her shoes to see that pulling up the carpet would not put her in a better place.

And lastly, either you fudged your work time or you need to raise your rates. This kind of job is the one nobody should take. If you seriously worked all day, with helpers, and including disposal, start charging more money before you're back on here with a question about the consequences of not having insurance or safety equipment. The right result in this case would have been for the realtor to go back to the homeowner for a real budget. Both a yes and a no from the homeowner would have been better than where you are now.
twestgard is offline   Reply With Quote
The Following User Says Thank You to twestgard For This Useful Post:
TopFloor (06-18-2009)
Old 06-17-2009, 09:56 AM   #16
Pro
 
the big 12 inch's Avatar
Trade: hardwood floor contractor 28 yrs.
 
Join Date: Jan 2009
Location: fayetteville GA
Posts: 138
Your not a contractor...your an idiot...theres a difference
the big 12 inch is offline   Reply With Quote
Old 06-17-2009, 10:04 AM   #17
Handle It!
 
MALCO.New.York's Avatar
Trade: Everything The Union Guys Do Not Want To Do
 
Join Date: Feb 2008
Location: Brooklyn, NY ~ Haverford, PA
Posts: 7,892
Quote:
Originally Posted by the big 12 inch View Post
Your not a contractor...your an idiot...theres a difference

UGLY!!!

Harsh!

You should be ashamed with yourself!

.(But you do speak the unbridled TRUTH!!!!).
__________________
Something to One may be Nothing to another!

Ultimate Wisdom---------
http://www.youtube.com/watch?v=_k1Ug...ture=rec-HM-r2
MALCO.New.York is offline   Reply With Quote
Old 06-17-2009, 10:38 AM   #18
Pro
 
the big 12 inch's Avatar
Trade: hardwood floor contractor 28 yrs.
 
Join Date: Jan 2009
Location: fayetteville GA
Posts: 138
It just seems like we get a lot of these"i'm a contractor but I don't know anything"threads...
the big 12 inch is offline   Reply With Quote
The Following User Says Thank You to the big 12 inch For This Useful Post:
MALCO.New.York (06-17-2009)
Old 06-18-2009, 01:02 AM   #19
Pro
 
TopFloor's Avatar
Trade: Floorist
 
Join Date: Apr 2009
Location: San Diego
Posts: 130
Where is the Contract?

...
__________________
~Greatness is a result of focused, deliberate practice.~
Under Construction: www.topflooronline.com

Last edited by TopFloor; 06-30-2009 at 03:12 AM. Reason: I reread my answer and saw it was absent of any useful commentary.
TopFloor is offline   Reply With Quote
Old 06-18-2009, 08:29 AM   #20
Registered User
Trade: general home improvements
 
Join Date: Jun 2009
Posts: 2
Thank you for all of those who kindly replied. I wanted to take a moment to let you all know that the issue was resolved and received our fee in full after she had a contractor that specializes in HWF's take a look at the floors. He, as well informed her that the floors needed to be refinished. What she plans to do, Im not sure of.

I may be new, but Im not stupid. We did have a signed contract and recieved a deposit before the work was set to begin. I ALWAYS use contracts.

As far as my fee, this fee was a discounted rate. Also, bear in mind that I am in West Virginia. Your fees may not be the same as the fees in our area.
Lanham79 is offline   Reply With Quote
The Following User Says Thank You to Lanham79 For This Useful Post:
TopFloor (06-18-2009)
Reply

Tags
carpet, flooring


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Don't mess with a bear!GRAPHIC! CrpntrFrk Off Topic (Non Trade) 21 06-18-2009 01:06 AM
Taking over a mess strathd Framing 6 02-01-2009 06:33 PM
Mess in the attic DavidC Roofing 3 11-14-2008 09:56 PM
What a mess. not2late Electrical 56 02-04-2008 10:58 PM
Anyone mess with Stone decks Oregon_Rob Decks & Fencing 3 01-22-2006 10:15 AM




Top of Page | View New Posts


All times are GMT -5. The time now is 08:08 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC