Baseboard before floor?
Hi all,
My partner and I have a job coming up shortly to install about 1000 sq ft of hardwood floor - 3/4" prefinished bamboo - in 3 rooms & a hallway. Both of us are relative newbies so please forgive any stupid questions.
He mentioned being at other job sites where the baseboard was installed prior to the finished floor being laid. Apparently this sequence was planned to prevent any damage to the floor from the baseboard install.
I have always done it floor first then baseboards after.
Any thoughts from the experts out there on the pros and cons - baseboards first or floor first?
Also, any particular quirks to installing bamboo versus say oak?
Thanks for your help!
Graeme
|
|
|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury
or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Join the #1 Contractor Forum Today - It's Totally Free!
ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!
Join ContractorTalk.com - Click Here

|
04-05-2006, 10:45 AM
|
#2
|
|
Pro
Trade:
Hardwood Flooring
Join Date: Aug 2005
Location: Washington
Posts: 375
|
Floor first. Baseboard last. Bamboo is soft and splits easy on the tongue. Be careful and use lots of cardboard for staging tools and walking on. Sometimes the bamboo prefinished is only 1/2" thick so you will need an adapter plate for your machine if that is the case.
Don't cut any corners. Use lots of corregated cardboard. You can get it in rolls from packing distributors.
__________________
I admit...I don't know everything...but don't tell my kids I told you.
|
|
|
04-05-2006, 04:09 PM
|
#3
|
|
Member
Trade:
General Renovations
Join Date: Feb 2006
Location: Toronto, Canada
Posts: 52
|
Thanks Done - appreciate the feedback.
Cheers
Graeme
|
|
|
04-05-2006, 07:14 PM
|
#4
|
|
Cpt. Chaos
Trade:
Hard Surface Flooring
Join Date: Jan 2006
Location: Hampton, VA
Posts: 992
|
Sounds like good advice from a man that has laid some grass before lol. Be extremely cautious, its very soft, dents if you look at it crooked.
__________________
Precision Flooring
Hampton, VA (757) 256-0848
Tile, Hardwood, Laminate, and Resilients
Installation, Sales & Repair - "We do it right the FIRST time"
|
|
|
04-06-2006, 04:22 PM
|
#5
|
|
Member
Trade:
General Renovations
Join Date: Feb 2006
Location: Toronto, Canada
Posts: 52
|
Thanks again guys - much appreciated!
|
|
|
04-10-2006, 02:10 AM
|
#6
|
|
New Guy
Trade:
Trim/Finish Carpentry, Woodworking, if its wood we do it!
Join Date: Apr 2006
Posts: 20
|
Quote:
|
Originally Posted by Donedat
Floor first.
|
With unfinished hardwood, always run the floor first. However, when it comes to prefinished flooring, I respectfully disagree.
When we do the interior trim AND the prefinished bamboo flooring in a house (or any prefinished flooring for that matter), we always do all the trim first, using 3/4" spacers (or whatever width the floor you are using is) under the doors, cased openings, and baseboard as they are nailed. Typically, the painters come next and caulk/prime the entire house, and sometimes even throw up the first coat or all of the paint. Then we come back and run the flooring.
Doing it in this order saves the floor from any and all dings, dents, and scratches caused not only by trim installation, but also by the painters and any other yahoo that comes inside. Yes, corrugated cardboard meticulously added on top of the flooring helps exponentially, but any materials, tools, or paint cans that slip from somebody's butterfingers (we all have them sometimes, accidents happen) is susceptible to gouging the cardboard, and certainly the floor underneath.
Yes, painting the whole interior makes the walls and trim equally as vulnerable to scuffs and dents caused during the process of laying the flooring, but thats what the point-up is for. You cant go back and skim or repaint prefinished flooring, and wood putty is an eyesore as it is in the facenails along walls.
|
|
|
04-11-2006, 11:40 PM
|
#7
|
|
Pro
Trade:
Hardwood Flooring
Join Date: Aug 2005
Location: Washington
Posts: 375
|
Kris,
I disagree. Mainly because you don't want to pay your hardwood installer 5 bucks a square foot to install in your homes. You expect him to give you the same price as if he didn't have to install under existing baseboard. You may think you're saving time and money doing it your way, but your installer should get paid more for it. You would actually save money using floor protection and expecting the subs to tread lightly after the flooring goes in.
__________________
I admit...I don't know everything...but don't tell my kids I told you.
Last edited by Donedat; 04-11-2006 at 11:50 PM.
|
|
|
04-12-2006, 04:18 PM
|
#8
|
|
New Guy
Trade:
Trim/Finish Carpentry, Woodworking, if its wood we do it!
Join Date: Apr 2006
Posts: 20
|
Donedat,
I'm sorry if I hadn't clearly indicated that we are not contractors, we are the interior trim guys/hardwood installers/punch out/whatever random thing the contractor asks us to do. It also means we are the ones that come back in and replace prefinished flooring that has been scratched. As a matter of fact, this weekend we will be tearing out an entire kitchen in a house that closed last month, because it was so scratched up from the cabinet guys.
Last edited by kris jusnes; 04-12-2006 at 04:22 PM.
|
|
|
04-12-2006, 04:59 PM
|
#9
|
|
Pro
Trade:
Residential Contractor
Join Date: Feb 2004
Location: Jensen Beach, FL
Posts: 10,376
|
I try to do the base after flooring. 1/4 round/shoe mould just looks tacky to me. If you HAVE to do it, compound the base. It looks much better IMHO.
__________________
You can't solve you're problems with the same level of thinking that created the problems.
Albert Einstein
|
|
|
04-12-2006, 11:22 PM
|
#10
|
|
Pro
Trade:
hardwood floors
Join Date: Aug 2005
Posts: 173
|
If it is something thin like 3/8 or 1/2" flooring we leave the base boards on and then run shoe after we get done. I know a lot of people who do that. Especially if the house is not new.
|
|
|
04-14-2006, 12:19 PM
|
#11
|
|
Pro
Trade:
Hardwood Flooring
Join Date: Aug 2005
Location: Washington
Posts: 375
|
Quote:
|
Originally Posted by kris jusnes
Donedat,
I'm sorry if I hadn't clearly indicated that we are not contractors, we are the interior trim guys/hardwood installers/punch out/whatever random thing the contractor asks us to do. It also means we are the ones that come back in and replace prefinished flooring that has been scratched. As a matter of fact, this weekend we will be tearing out an entire kitchen in a house that closed last month, because it was so scratched up from the cabinet guys.
|
Ouch. Sure hope you guys don't have to pick that one up for free. Yep, if the General would just vacuum and the cabinet guys could also. I like the floor protection idea.
__________________
I admit...I don't know everything...but don't tell my kids I told you.
|
|
|
04-14-2006, 03:53 PM
|
#12
|
|
New Guy
Trade:
Trim/Finish Carpentry, Woodworking, if its wood we do it!
Join Date: Apr 2006
Posts: 20
|
Quote:
|
Originally Posted by Donedat
Ouch. Sure hope you guys don't have to pick that one up for free. Yep, if the General would just vacuum and the cabinet guys could also. I like the floor protection idea.
|
Ha ha, no sir, you better believe we'll be hearing that cha-ching!
For some reason, very few other subcontractors we work around pick up their smaller trash, let alone sweep or vaccuum. We ALWAYS finish our job and make it look like we were never there. Thats just manners, you know?
I dont mind holding our trim up first and then sliding the prefinished hardwood underneath after the fact. It saves us from coming back for repairs, which I cant stand. Even though we charge for it and make it worth our while, I much prefer forward progress at all times.
|
|
|
04-14-2006, 03:55 PM
|
#13
|
|
New Guy
Trade:
Trim/Finish Carpentry, Woodworking, if its wood we do it!
Join Date: Apr 2006
Posts: 20
|
Quote:
|
Originally Posted by Teetorbilt
I try to do the base after flooring. 1/4 round/shoe mould just looks tacky to me. If you HAVE to do it, compound the base. It looks much better IMHO.
|
In the vast majority of new construction houses we run the prefinished flooring in, the dips and bumps across the span of the floors usually cause gaps under the baseboard, big or small. I would be absolutely tickled to have a job where all the base sits nice and tight over every foot of the flooring!
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate This Thread |
Linear Mode
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|